Scope of Work:
  • Fabrication and erection of steel structure.
  • Construction of generator foundations, central administration, water treatment & auxiliary buildings.
  • Erection & commissioning of generators and auxiliaries.
  • Balance of plant works.
  • Electro mechanical works.
  • HVAC system (design & installation).
  • Process piping works. `
  • Construction of water & oil tanks.
  • Plant roads, drainage and Infrastructure facilities.
  • Design & erection firefighting system.
  • Design & erection Telephone & lighting network.
  • Design and construct the MV distribution network.