Borg El Arab Central Power Plant (2) : 70MW

Kahraba has built a new Central power plant in Borg Al-Arab (10,000 Square meters).
The plant includes (7) Gas engines units with total capacity 70MW through two phases:
  • Phase (1): Finalized on November 2017 with capacity of 30MW with a total investment of 26.1 Million Euro.
  • Phase (2): Finalized on November 2019 with capacity of 40MW with a total  investment of 25 Million Euro.
  • Granting customer backup solutions with a  highly  qualified O&M team available 24/7.